|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| Light Source: | LED Lamp |
| Lamp Body Material: | Aluminum Alloy |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Specifications of 30m High Mast Pole | ||
| 30m high mast pole | Photo of product | |
| Height of mast | 30 meters | ![]() |
| No. of Sections | 3 (10.6m each sections) | |
| Material construction | Q345B | |
| Thickness of sections | 8mm, 6mm, 6mm | |
| No. of longitudinal welds /section | 1 | |
| Make of luminaire /lamp | LED | |
| Cross section of Mast | 12 sided polygon | |
| Base dia. & top diameter (A/F) | 520/200mm | |
| Metal protection treatment | Hot dip galvanization | |
| Method of hot dipping | Single Dipping | |
| Hot-dip galvanizing | 80μm | |
| Powder coating | 100μm | |
| Size of opening and door at base | 949mm x 375mm | |
| Diameter of flange plate | 800mm | |
| Thickness of flange plate | 25mm thick | |
| Lightning protection finial | 1.2m spike | |
| DYNAMIC LOADING AS PREVAILING AT SITE | ||
| Max. wind speed | 144 KM / HR | |
| Factor of safety for wind load | 1.5 | |
| FOUNDATION DETAILS | ||
| Type of foundation | Chimney & Pad Reinforced concrete | |
| Size of foundation | 3.15m x 3.15m x 1.5m | |
| Soil bearing capacity at site | 150 KPA | |
| Depth of foundation | 1.5M | |
| Number of foundation bolts | 10 | |
| PCD of foundation bolts | 680mm | |
| Type of foundation bolts | Mild Steel | |
| Bolt diameter | 36mm | |
| LANTERN CARRIAGE | ||
| Material of construction | Hot dipped galvanized | |
| CABLE | ||
| Type | Trailing cable | |
| Material | Unarmored with nitral insulation | |
| Conductor size | 4 - 7mm sq copper | |
| No. of cores | 5 -7 | |
| WINCH | ||
| Number of drums/winch | Pymot double drum | |
| Gear Ratio | 50 : 1 | |
| Capacity | 800 kgs | |
| Method of operation | Remote via Motor | |
| Lubrication arrangement | oil bath | |
| Type of lubricant | oil bath | |
| Rated power | 1.5KW | |
| Rated voltage | 380V | |
| Rated frequency | 50Hz | |
| IP Grate | IP55 | |
| Insulation Level | Class F | |
| STAINLESS STEEL WIRE ROPE | ||
| Grade | 316 | |
| Number of ropes | 3 | |
| Construction | 6/19 | |
| Diameter (mm) | 6mm | |
| Braking load capacity | 2270 | |
| Factor of Safety | 5 | |
| 280W flood lights | Photo of product | |
| Number of LED Lights | 9 | ![]() |
| Light Chip | LED | |
| LED Light Source | COB | |
| Voltage Range/Frequency | 220-240V/50Hz | |
| LED Luminous Efficiency | >90% | |
| Power factor | >0.95 | |
| Power consumption | 280w | |
| Luminous Efficacy(lm/W) | 120 | |
| CRI (Color Rendering Index) | >75 | |
| Color Temperature | 3200K~6000K | |
| Materials and Finishing | Glass: Tempered Glass Gasket: Heat Resistant Silicon Rubber Housing: Die-cast Aluminium |
|
| Lifetime | >50,000 Hours (70% Lumen Maintenance @ Ta 35°) | |
| Installation | Use of a Universal Bracket | |
| Certifications | CE | |
| Surge protection | 10kV | |
| Warranty period | Minimum 3years | |
| Operating Temperatures | -40° to 45°C (Minimum and maximum acceptable values for outdoor applications) | |
| IP Grade | IP66 | |
Q1: Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A: Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q4: Do you offer guarantee for the products?
A: Yes, we offer 2-5 years warranty to our products.
Q5:How to Choose the System Voltage 12V or 24V or for normal street Light ?
A:We can design the system for 12v or 24v according to the LED light power.
Q6. How to proceed an order for led light?
A: Firstly,let us know your requirements or application.
Secondly,We quote according to your requirements or our suggestions.
Thirdly,customer confirms the samples and places deposit for formal order.
Fourthly,We arrange the production.