Customization: | Available |
---|---|
After-sales Service: | Offer |
Warranty: | Offer |
Still deciding? Get samples of US$ 200/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Max Power | 20W/30W/40W/50W/60W |
LED driver | MEANWELL/..../ZHIHE |
LED chip | Branded chip |
Material | Die-casting aluminum+Glass Cover |
Light Luminous Efficiency | >150 lm/W |
Uniformity | >0.8 |
Average illumination | 6m>25LUX 8m>20LUX |
LED Luminous Efficiency | >90% |
Color temperature | 3000-6500K |
Color Rendering index | Ra>75 |
Input Voltage | DC12/24V |
Power Efficiency | >90% |
Power Factor | >0.95 |
Working environment | -40ºC~60ºC |
IP rating | IP65 |
Working life | >50000hours |
Warranty | 5years |
Size | 500*235*75mm |
Wight | 3.2kg |
Q1: Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A: Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q4: Do you offer guarantee for the products?
A: Yes, we offer 2-5 years warranty to our products.
Q5:How to Choose the System Voltage 12V or 24V or for normal street Light ?
A:We can design the system for 12v or 24v according to the LED light power.
Q6. How to proceed an order for led light?
A: Firstly,let us know your requirements or application.
Secondly,We quote according to your requirements or our suggestions.
Thirdly,customer confirms the samples and places deposit for formal order.
Fourthly,We arrange the production.